Version samples
Gallery / Stacked 3D Bar Chart with Negative Values
A chart with two series demonstrating a profit from cosmetic products bought by men and women with the
Gallery / Composition of the human body
A Tree Map demonstrating the chemical composition of an average human body in kg. Tooltips show the additional information about the effect this element has on a body and if this element is essential or not.
Gallery / US population
The Chart describes the population in the states of the USA and in the most populated towns of these states. The Color Scale uses colors from red (the highest values) to orange (the lowest values).
Gallery / Adaptive Moving Average (AMA)
A sample of calculating an Adaptive Moving Average indicator
Gallery / Risk Matrix
This Heat Map shows the levels of risk depending on the frequency and the severity of errors on a server. Both parameters have 5 grades: from low (rare) to extreme (almost certain).
Gallery / Bar Chart
Bar chart consists of rectangular bars that represent the changes over a period of time or for comparing data values of some objects. This simple bar chart displays the revenue a company gets selling its products.
Gallery / Multi-Series 3D Bar Chart with Z Distribution
This 3D Bar Chart displays top three cosmetic products sales in four regions. The series are redistributed along the Z-Axis instead of being placed along the X-Axis as usual.
Gallery / Multi-Series 3D Column Chart
A 3D Column Chart describing the revenue from three cosmetic products sales in four states.
Gallery / Stacked Polygon Polar Chart
Gallery / Vertical Stick Chart
Gallery / Average True Range (ATR)
Gallery / Combination of Bar and Vertical Line Chart