Version samples
Gallery / Multi-Series 3D Area Chart with HatchFill
This Chart demonstrates how the ACME Corp. and its competitor's share average prices in dollars were changing from 1986 till 2005.
Gallery / Risk Matrix
This Heat Map shows the levels of risk depending on the frequency and the severity of errors on a server. Both parameters have 5 grades: from low (rare) to extreme (almost certain).
Gallery / Spline Polar Chart
A polar chart with three series decorated differently demonstrate different microphone types patterns: cardioid, bidirectional amd omnidirectional.
Gallery / Line
Exchange rates dashboard, with minimum and maximum of each sparkline marked.
Gallery / Multi-Series 3D Column Chart
A 3D Column Chart describing the revenue from three cosmetic products sales in four states.
Gallery / Composition of the human body
A Tree Map demonstrating the chemical composition of an average human body in kg. Tooltips show the additional information about the effect this element has on a body and if this element is essential or not.
Gallery / Bar Chart
Bar chart consists of rectangular bars that represent the changes over a period of time or for comparing data values of some objects. This simple bar chart displays the revenue a company gets selling its products.
Gallery / Multi-Series 3D Bar Chart with Z Distribution
This 3D Bar Chart displays top three cosmetic products sales in four regions. The series are redistributed along the Z-Axis instead of being placed along the X-Axis as usual.
Gallery / Stacked Polygon Polar Chart
Gallery / Average True Range (ATR)
Gallery / Vertical Stick Chart
Gallery / Stick Chart
Stick Chart showing 20 largest cities in the world by their population.