Version samples
Gallery / Single-Series Area Chart
Single series Area Chart visualizes share prices for one month. Each point represents a day of the month.
Gallery / Wine Consumption Map of USA
Gallery / Top 30 Places to Visit in Italy
Gallery / Event Markers
Gallery / Points Operations
An interactive Marker Chart where markers can be connected with each other by clicking at them. This function might be useful if you need to create a graph on a chart.
Gallery / Radar Chart with Two Area Series
This multi-series radar chart contains a couple of area series. Each series can be controlled using chart's legend. The chart displays the average temperature in London during a year.
Gallery / Range Column Chart
A Column Chart of 2 series describing the ranges between the lowest and the highest temperatures in London and Edinburgh during a year.
Gallery / Single-Series Spline-Area Chart
Single Series Spline chart shows temperature changes during one month. Spline with smooth angles puts accent to the fact that temperature changes gradually.
Gallery / Stacked Step-Area Chart
Current chart displays comments' statistic on a site. Stacked mode of the chart helps to display the comparison of the quantitative value each part of the category brings to the whole category.
Gallery / Stacked Area Radar Chart
The radar chart contains three area series. Each series represent sales in Arizona, Florida and Nevada. Stacked series is used to show that those values of our series together form a whole. Chart's legend can be used to control series on the chart.
Gallery / Range Bar Chart
A Range Bar Chart demonstrating eight cell phone models and how fast their batteries discarge.
Gallery / Lat Long API Demo