Version samples
Gallery / Development Team Plan (Time Tracking On)
Gallery / LED with Bar Gauges
There are LED and bar pointers used for demonstrating the revenue, the expenses and the profit levels of a company.
Gallery / Annotated Scatter Chart with Trend Channel
A Scatter Chart with two marker series demonstrates how annotations of trend type can be used. Both trends can be configured with clicking and dragging the boundaries.
Gallery / Blood Sugar Test
Two linear gauges, divided into three ranges that represent the glucose tolerance levels, standing for the patient's blood data before glucose injection and two hours after it.
Gallery / Trip Through the UK
Gallery / Combination of Bar and LED Pointers
There are four gauges, two of bar two of LED type, with different values and range. Each bar pointer equals a part of a LED pointer.
Gallery / Annotated Combination of OHLC Chart and Line Chart
Gallery / Weather Dashboard
A dashboard with two linear thermometers demonstrating the air and water temperature and one circular gauge showing the wind direction and strength.
Gallery / Spectrum
A gauge with an axis colored with a spectrum of colors with axis labels displayed and markers pointing at each 30?.
Gallery / Top 10 Largest Cities
This chart demonstrates 10 LED pointers with thin bar pointers over each of them, demonstrating the number of people living in the town.
Gallery / Airplane Design Process
Gallery / Pareto Chart of Customer Complaints
Customer Complaints Pareto Chart.