Version samples
Gallery / Relative Strength Index (RSI)
Adding and configuring Relative Strength Index (RSI) technical indicator, its scale configuration and the use of line markers to show Overbought/Oversold signals.
Gallery / US presidential election 2008
Gallery / Moving Average Convergence Divergence (MACD)
Adding and configuring Moving Average Convergence / Divergence (MACD) technical indicator.
Gallery / Religion in Africa with Orthografic Projection
Gallery / Spline Area Chart with Missing Points
Spline area chart compares average humidity changes over the year in two cities. Gaps in one of the series show missing data points in the data set.
Gallery / Countries by Population with August Projection
Gallery / Single-Series Area Chart with Logarithmic Y-Axis
Single series area chart shows website metrics - number of unique visitors through the year. The number of visitors variate greatly, so a logarithmic scale is used to make the chart easier to read.
Gallery / Top 25 Beaches in Australia
Gallery / Largest Lakes of USA by State
Gallery / Starbucks in China
Gallery / USA National Parks
Gallery / Bubble Map with Bonne Projection