Version samples
Gallery / Weight and Volume Ratio
A chart with 4 tank pointers, demonstrating the difference in the volume of different substances (water, oil, sugar and coffee) that equals one kilogram.
Gallery / Airplane Design Process
Gallery / Quadrant Motion
A quadrant chart which compares several bloggers' popularity, dividing them into those who are popular, those who are popular only in some particular group of audience, those who need more activity, and starters.
Gallery / KDJ Indicator
Gallery / Map with Nepal Localization
Gallery / Pareto Chart of Restaurant Complaints
Restaurant Complaints Pareto Chart.
Gallery / Vertical Combination of Column and Jump Line Chart
Gallery / Bollinger Bands Width (BBands Width)
A demonstration of creating a Bollinger Bands and a Bollinger Bands Width indicators over the OHLC series
Gallery / Garage Construction PERT Chart
Gallery / Periodic Table
This Heat Map represents the Mendeleev?s periodic table, colored according to the element types, which all are mentioned in the legend.
Gallery / BI Services Comparison
Gartner Magic Quadrant distributes companies into four quadrants by the levels of ability to execute and completeness of vision.
Gallery / Top 30 Countries by Quality of Life
Countries distributed inside the quadrant according to the pollution and life index levels.